How Faster Lead Times Give Installers a Competitive Edge
In the 2026 glazing industry, the gap between a “lead” and a “completed install” has become the most critical metric for success. With the Future Homes Standard driving a massive wave of retrofits and new builds, homeowners and developers are no longer willing to wait 12–16 weeks for premium aluminium systems. For installers, the ability […]

